City of Encinitas
Home MenuGovernment » Public Notices » Development Services Public Notices
Environmental Notices
Environmental Notices
Mobility Element Update
Case Number: PLCY-007022-2024 (CA State Clearinghouse No. 2022080705)
Draft Environmental Impact Report
Public Review and Comment Period: September 6, 2024 to October 21, 2024
Notice of Availability of Draft EIR Link
Draft Environmental Impact Report Compiled Link
Cover Page Link
Table of Contents Link
Executive Summary Link
Chapter 1 – Introduction Link
Chapter 2 – Project Description Link
Chapter 3 – Environmental Analysis Link
3.1 Air Quality Link
3.2 Greenhouse Gas Emissions and Climate Change Link
3.3 Noise and Vibration Link
3.4 Land Use and Planning Link
3.5 Public Services and Facilities Link
3.6 Transportation and Circulation Link
Chapter 4 – Other CEQA Required Topics Link
Chapter 5 – Cumulative Impacts Link
Chapter 6 – Project Alternatives Link
Chapter 7 – List of Acronyms Link
Chapter 8 – List of References Link
Chapter 9 – List of Preparers Link
Appendices Compiled Link
Appendix A – Notice of Preparation Link
Appendix B.1 – Draft Mobility Element Link
Appendix B.2 – Mobility Analysis Guidelines Link
Appendix C – Air Quality and Greenhouse Gas Emissions Modeling Data Link
Appendix D – Noise Measurements and Data Link
Appendix E – Transportation Impact Analysis Link
Piraeus Point
Case Numbers: MULTI-005158-2022; CDP-005161-2022; DR-005160-2022; SUB-005159-2022; and SUB-005391-2022 (CA State Clearinghouse No. 2022050516)
Draft Final Environmental Impact Report
Responses to Comments - Table of Contents Link
Final Draft Environmental Impact Report (Compiled) Link
Cover Link
Table of Contents Link
Title Page Link
Preface Link
Preface - Response to Comments Link
Executive Summary Link
Chapter 1 - Introduction Link
Chapter 2 - Project Description Link
Chapter 3 - Environmental Analysis Link
3.1 Aesthetics Link
3.2 Air Quality Link
3.3 Biological Resources Link
3.4 Cultural Resources Link
3.5 Energy Conservation Link
3.6 Geology and Soils Link
3.7 Hazards and Hazardous Materials Link
3.8 Hydrology and Water Quality Link
3.9 Land Use and Planning Link
3.10 Noise Link
3.11 Public Services and Recreation Link
3.12 Transportation Link
3.13 Tribal Cultural Resources Link
3.14 Utilities and Services Systems Link
3.15 Wildfire Link
Chapter 4 - Environmental Effects Found Not to Be Significant Link
Chapter 5 - Alternatives Link
Chapter 6 - Other CEQA Considerations Link
Chapter 7 - Preparers Link
Chapter 8 - References Link
Mitigation Monitoring & Reporting Program Link
Technical Appendices
Appx A. Notice of Preparation and Scoping documents (Part 1) Link
Appx A. Notice of Preparation and Scoping Documents (Part 2) Link
Appx A. Notice of Preparation and Scoping Documents (Part 3) Link
Appx B. Lighting Plan Link
Appx C-1. Air Quality Assessment Link
Appx C-2. Health Risk Screening Letter Link
Appx D. Biological Technical Report (Part 1) Link
Appx D. Biological Technical Report (Part 2) Link
Appx E. Archaeological Inventory and Evaluation Report (Part 1) Link
Appx E. Archaeological Inventory and Evaluation Report (Part 2) Link
Appx E. Archaeological Inventory and Evaluation Report (Part 3) Link
Appx F. Greenhouse Gas Assessment Link
Appx G-1. Geotechnical Investigation Link
Appx G-2. Consultation Limits of Areas of Previous Grading Disturbance Link
Appx G-3. Paleontological Records Search Link
Appx H-1. Phase I Environmental Site Assessment Report (Part 1) Link
Appx H-1. Phase I Environmental Site Assessment Report (Part 2) Link
Appx H-1. Phase I Environmental Site Assessment Report (Part 3) Link
Appx H-2. Phase I and II ESA Site Assessment Report (Part 1) Link
Appx H-2. Phase I and II ESA Site Assessment Report (Part 2) Link
Appx I-1. Preliminary Hydrology Study Link
Appx I-2. Preliminary Stormwater Quality Management Plan (Part 1) Link
Appx I-2. Preliminary Stormwater Quality Management Plan (Part 2) Link
Appx I-2. Preliminary Stormwater Quality Management Plan (Part 3) Link
Appx J. Noise Study Link
Appx K. Transportation Impact Study Link
Appx L. AB 52 Correspondence Link
Appx M. Preliminary Wastewater Report Link
Appx N. Project Facility Availability Forms Link
Appx O. Fire Protection Plan Link
Piraeus Point
Case Numbers: MULTI-005158-2022; CDP-005161-2022; DR-005160-2022; SUB-005159-2022; and SUB-005391-2022 (CA State Clearinghouse No. 2022050516) Notice
Draft Environmental Impact Report
Public Review and Comment Period: December 9, 2022 to February 6, 2023
Notice of Availability of Draft EIR Link
Cover Link
Title Page Link
Table of Contents Link
Executive Summary Link
Chapter 1 - Introduction Link
Chapter 2 - Project Design Link
Chapter 3 - Environmental Analysis Link
3.1 Aesthetics Link
3.2 Air Quality Link
3.3 Biological Resources Link
3.4 Cultural Resources Link
3.5 Energy Conservation Link
3.6 Geology and Soils Link
3.7 Hazards and Hazardous Materials Link
3.8 Hydrology and Water Quality Link
3.9 Land Use and Planning Link
3.10 Noise Link
3.11 Public Services and Recreation Link
3.12 Transportation Link
3.13 Tribal Cultural Resources Link
3.14 Utilities and Services Systems Link
3.15 Wildfire Link
Chapter 4 - Environmental Effects Found Not to Be Significant Link
Chapter 5 - Alternatives Link
Chapter 6 - Other CEQA Considerations Link
Chapter 7 - Preparers Link
Chapter 8 - References Link
Technical Appendices
Appendix Title Sheet Link
Appx A. Notice of Preparation and Scoping documents (Part 1) Link
Appx A. Notice of Preparation and Scoping Documents (Part 2) Link
Appx A. Notice of Preparation and Scoping Documents (Part 3) Link
Appx B. Lighting Plan Link
Appx C-1. Air Quality Assessment Link
Appx C-2. Health Risk Screening Letter Link
Appx D. Biological Technical Report (Part 1) Link
Appx D. Biological Technical Report (Part 2) Link
Appx E. Archaeological Inventory and Evaluation Report (Part 1) Link
Appx E. Archaeological Inventory and Evaluation Report (Part 2) Link
Appx E. Archaeological Inventory and Evaluation Report (Part 3) Link
Appx F. Greenhouse Gas Assessment Link
Appx G-1. Geotechnical Investigation Link
Appx G-2. Consultation Limits of Areas of Previous Grading Disturbance Link
Appx G-3. Paleontological Records Search Link
Appx H-1. Phase I Environmental Site Assessment Report (Part 1) Link
Appx H-1. Phase I Environmental Site Assessment Report (Part 2) Link
Appx H-1. Phase I Environmental Site Assessment Report (Part 3) Link
Appx H-2. Phase I and II ESA Site Assessment Report (Part 1) Link
Appx H-2. Phase I and II ESA Site Assessment Report (Part 2) Link
Appx I-1. Preliminary Hydrology Study Link
Appx I-2. Preliminary Stormwater Quality Management Plan (Part 1) Link
Appx I-2. Preliminary Stormwater Quality Management Plan (Part 2) Link
Appx I-2. Preliminary Stormwater Quality Management Plan (Part 3) Link
Appx J. Noise Study Link
Appx K. Transportation Impact Study Link
Appx L. AB 52 Correspondence Link
Appx M. Preliminary Wastewater Report Link
Appx N. Project Facility Availability Forms Link
Appx O. Fire Protection Plan Link
Project Documents
Tentative Map Link
Notice Of Preparation Of Environmental Impact Report
Piraeus Point
Case #MULTI-005158-2022 Notice Notice of Preparation
Scoping Meeting - Thursday, June 16, 2022 at 1:00PM Notice
El Camino Real Specific Plan
Case Number: PLCY-007016-2024 (CA State Clearinghouse No. 2024060039)
Final Draft Mitigated Negative Declaration Link
Final Draft Mitigated Negative Declaration and Mitigation, Monitoring, and Reporting Program Link
Appx A. Road Construction Emissions Model Link
Appx B. Transportation Impact Analysis Link
Appx C. Records Search Link
Response to Comments Link 1 of 2 Link 2 of 2
Public Review Draft Mitigated Negative Declaration (Public Comment Period June 3, 2024 - July 2, 2024) Notice
Public Review Draft Mitigated Negative Declaration Link
Appx A. Road Construction Emissions Model Link
Appx B. Transportation Impact Analysis Link
Appx C. Records Search Link
Torrey Crest Residential Subdivision
Case #MULTI-004309-2021
Final EIR 1 of 3
Final EIR 2 of 3
Final EIR 3 of 3
Volume II Cover
Volume II Title Page
Appendices of Final EIR Volume II
Appendix A-1 Notice of Preparation and Scoping Responses
Appendix A-2 Citizen Participation Report (5-17-22)
Appendix B (1 of 2) Community Character (Feb 2024)
Appendix B (2 of 2) Community Character (Feb 2024)
Appendix C-1 Bio Report (Nov 2023)
Appendix C-2 Tree Survey (Aug 2024)
Appendix C-3 Tree memo (Nov 2023)
Appendix D-1Cultural Report (with DPRs)
Appendix D-2 AB52 Consultation
Appendix E Geotech Report
Appendix F-1 (1 of 3) Phase I and II ESA
Appendix F-1 (2 of 3) Phase I and II ESA
Appendix F-1 (3 of 3) Phase I and II ESA
Appendix F-2 Soil Remediation Plan
Appendix F-3 County Approval of SRP_CHSP
Appendix G Prelim Hydro Report
Appendix H-1 PDP SWQMP
Appendix H-2 Stormwater Management
Appendix I Noise Study
Appendix J-1 Local Trans Analysis
Appendix J-2 VMT Analysis
Appendix K-1 Service Availability Letters
Appendix K-2 Fire Flow Letter
Appendix L Building Plan Set 1 of 2
Appendix L Building Plan Set 2 of 2
Appendix M Air Quality Study
Appendix N Landscape Plans
Appendix O Record of Survey
Appendix P Civil Plans
Marea Village Final EIR
Case #MULTI-003780-2020
Final EIR
Appendix A-1 Notice of Preparation and Scoping Documents
Appendix A-2 Citizen Participation Program Report
Appendix B Air Quality Assessment
Appendix C-1 Terrestrial Biological Resources Assessment
Appendix C-2 Arborist Report
Appendix D-1 Phase I Cultural Resources Technical Memorandum Redacted
Appendix D-2 Phase II Cultural Resources Technical Report Redacted
Appendix E GHG and Energy Technical Memo
Appendix F Geotechnical Investigation
Appendix G SWQMP
Appendix H Preliminary Hydrology Study
Appendix I Paleontological Resources Technical Report
Appendix J-1 Phase I ESA 1900 N. Highway 101
Appendix J-2 Phase I ESA 1950-2100 N. Coast Highway 101
Appendix K Noise And Groundborne Vibration Technical Memorandum
Appendix L-1 Vehicle Miles Traveled Analysis
Appendix L-2 Local Transportation Analysis
Appendix M-1 Preliminary Sewer Study
Appendix M-2 Fire Flow Analysis
Appendix M-3 Preliminary Water Demand Summary
Appendix N Project Facility Availability Forms
Mitigation Monitoring & Reporting Program
Public Review and Comment Period: September 24, 2021 - November 8, 2021
Marea Village Draft EIR
Case#MULTI-003780-2020 Notice
Draft EIR
Appendix A-1 Notice of Preparation and Scoping Documents
Appendix A-2 Citizen Participation Program Report
Appendix B Air Quality Assessment
Appendix C-1 Biological Resources Assessment
Appendix C-2 Arborist Report
Appendix D-1 Phase 1 Cultural Memo
Appendix D-2 Phase II Cultural Memo
Appendix E GHG and Energy Technical Memo
Appendix F Geotechnical Investigation
Appendix G SWQMP
Appendix H Preliminary Hydrology Study
Appendix I SDNHM Paleo Report
Appendix J-1 Phase I ESA 1900 N
Appendix J-2 Phase I ESA 1950-2100
Appendix K Noise Technical Memorandum
Appendix L-1 VMT Analysis
Appendix L-2 Local Transportation Analysis
Appendix M-1 Preliminary Sewer Study
Appendix M-2 Fire Flow Analysis
Appendix M-3 Preliminary Water Demand Summary
Appendix N Project Facility Availability Forms
The Sanctuary Project
Case #MULTI-002610-2018 Notice
Initial Study/Mitigated Negative Declaration Link
Appendix A - Air Quality Technical Report
Part 1
Part 2
Part 3
Appendix B - Local Transportation Analysis
Appendix C - Biology Field Survey
Appendix D - Limited Geotechnical Investigation and Update Report
Appendix E - Priority Development Project Stormwater Quality Management Plan
Appendix F - Phase I Environmental Site Assessment
Part 1
Part 2
Part 3
Part 4
Appendix G - Limited Phase II Environmental Site Assessment
Appendix H - COSD DEHQ VAP Concurrence Letter
Appendix I - Fire Protection Plan
Appendix J - Preliminary Hydrology Study
Appendix K - Noise Technical Memorandum
Draft Mitigated Negative Declaration comment period May 17, 2024 to June 17, 2024
La Costa Boutique Hotel
Case #MULTI-002750-2018 Notice Project Info
Draft Mitigated Negative Declaration
- Draft Initial Study Checklist Link
- Draft Mitigated Negative Declaration Link
- Visual Resource Analysis Link
- Air Quality Analysis Link
- Biology Link
- Cultural Link
- GHG Analysis Link
- Geotechnical Study Link
- Geotechnical Addendum 1 Link
- Geotechnical Addendum 2 Link
- Project Plans Link
- SWQMP October 2020 Link
- Noise Study Link
- Traffic Link
- Vehicle Miles Traveled Analysis Link
- Preliminary Hydrology Study (July 2021) Link
- Phase I and II Environmental Site Assessment Study Link
- Soil Management Plan Link
- Community Health and Safety Plan Link
- County Department of Environmental Health Approval Link
- Supplemental Analysis Memo Link